problem
Strictly follow the drawings for construction and abide by the "one pen" system for design changes
We must give and respect the designer's absolute has the voice over the design plan, and strictly follow the drawings for construction. If it is really necessary to make changes to the plan, we should strictly abide by the change procedures, seek the permission and signature of the design unit and the chief designer, and change the "one pen" system in the action plan. For those who do not strictly follow the drawings and do not abide by the design plan change procedures, the design unit and designer have the right to refuse to stamp and sign on the completion drawing. Only by strictly observing this basic red line can we ensure the originality of the design drawings from the system and ensure the quality of the landscaping project from the source.